1. Does the fee for this project take 23.61% or 23.18%? Is the tax taken at 3.513%?
A: The fee is 23.18% and the tax is 3.513%.
2. Some manufacturers have their own fixed authorization format. They cannot fill in the format provided by you. What should I do?
A: You can follow the manufacturer's fixed authorization format.
3. On the P9 page of the bidding documents, the integrated wiring system adopts five types of horizontal wiring, and the library part of the list is the five types of lines. Which one is the standard?
A: Use super five horizontal wiring.
4. The technical standard component of the P46 page of the bidding documents 2) The manufacturer's authorization is inconsistent with the content provided by the 5) letter of commitment. What should I do?
A: Please follow the requirements of the bidding documents.
5. There is no project name column in the “Material List of Equipment†on page P47 of the bidding documents.
A: Add the project name column by yourself.
6. P55 page of the bidding documents “15. Material Temporary Pricing Summary Form†is not included in the business standard format. Is it the “System and Equipment Price Summary Table†on the P78 page of the bidding documents?
A: This tender has no material temporary pricing summary table, which is the system and equipment price summary table.
7. Is the unit price in the “System and Equipment Price Summary Table†on the P78 page of the bidding documents a comprehensive unit price or equipment price?
A: According to the P68 page of the bidding documents, please indicate the quotation.
8. The two tables provided in the P85 page of the bidding documents, “Table 1-2, part of the project quantity listâ€, total 379 (172+207) items are the list of all equipment for this bid, “Table 1-2-2 system , the equipment in the equipment list is repeated with the table in Table 1-2?
Answer: The systems and equipment listed in Table 1-2-2 are quoted in this table, and do not enter the quotation of 1-2. The two tables must not be counted for the same equipment.
9. Can this bid use the red stamp in the original, and use the copy stamp in the copy?
A: Yes.
10. Please specify the level of qualification of the project leader for the construction engineer? P15 page Credit information The content of the bidding document provides the work item of the project leader in the first article, because the project leader has only the Class B and the certificate of practice without a workbook.
A: The person in charge of the project has a construction engineer certificate, a class B and a certificate of practice. No work manual is required.
11. The “Material Equipment Summary Form†in the electronic version of the bill of materials provided on the CD-ROM of the bidding documents contains a summary table of materials for supply, but there is no such document in the bidding documents. What should I do?
A: The bidding documents shall prevail.
12. Entry 10 in the fourth page of P17 of the bidding documents: The total package service (engineering package) fee is 40% of the total bid price as the billing base, and the rate is 3%; Item 13: The total package service fee is the total bid price. For the billing base, the rate is 3%. There are contradictions between the two, please be clear?
Answer: The item 10 total package service (engineering package) fee is based on 40% of the total bid price, and the rate is 3%.
13. The two units are reflected in the list. The P9 page of the bidding documents and the meanings expressed in Tables 1-2 and 1-3 are three unit projects. How can I explain this?
A: The 2 unit project shall prevail.
14. Table 1-6-2 on page P73 of the bidding documents is to write all the materials in the bill of quantities or write the materials in the “Table 1-6-2 Main Material Quantity Table�
Answer: Table 1-6-2 Materials in the main material quantity table.
15. Is the system and equipment price summary table provided according to the materials in the “Table 1-2-2 System Equipment List†or the materials in the “Table 1-2 Partial Engineering Quantity List�
A: According to the material in “Table 1-2-2 System Equipment Listâ€.
16. Table 1-1-3. How many forms are provided according to the number of units?
A: Yes.
17. Does the “Engineering Quantity List Quotation (various quotation)†in the contents of the business target refer to all forms between the bidding documents P64-P78?
A: Yes.
18. The electronic file drawings provided by the system lack drawings of parts such as the underground parking garage.
A: No.
19. The bidding agency fee is not reflected in the bidding documents. Can you understand that the bidding agency fee is not included in the total bid price? Please be clear.
A: The bidding agency fee is paid by the tenderer and is not included in the total bid price.
20. The construction organization measures fee requirements are as follows: Li Jianfa [2006] No. 122 document, according to the upper limit, but our company can not find the document, please ask the bidding company to provide relevant accurate data.
A: The construction organization measures fee is calculated according to the median value according to the documents of Zhejiang Provincial Construction and Construction [2009] No. 91 and No. 92, and no competition is allowed. The cost of construction engineering safety protection and civilized construction measures is not a competitive expense.
21, the bidding documents proposed, the project's current fixed budget price, engineering guidance price reference: 2008 Longquan City Building Materials Market Materials Information Volume 12, Zhejiang Shengli Water City relevant documents and laws and regulations and provincial station related quota interpretation. Our company can't find relevant documents and accurate data, please ask the bidding company to provide relevant accurate data.
A: Solve it by yourself.
22. Is the “original manufacturer's authorization commitment and after-sales service commitment letter†placed in the credit part? The P15 page of the bidding documents is presented in the credit section, but the items in the P37 page are missing.
A: "The original manufacturer's authorization commitment and after-sales service commitment" is placed in the technical part.
Second, the list part
1. The engineering quantity list is marked 1-2, page 1, serial number 13 and 14: six-core multimode fiber HYA100*2*0.4 and four-core single-mode fiber SYWV-75-12. This model description is incorrect, please specify?
A: The price is as follows: the number of six-core multimode fiber is 250 meters, the number of HYA100*2*0.4 is 200 meters, the four-core single-mode fiber is 150 meters, and the SYWV-75-12 is 460 meters.
2, in the engineering quantity list table 1-2 page 6 LED system, the size of the indoor screen can be found on the drawings, the size of the outdoor screen is not, please be clear?
A: Cancel the outdoor screen device.
3. In this bidding document, there are no specific detailed technical specification parameters for each system equipment. For the technical specifications deviation table of the tender documents, the bidding unit cannot provide detailed information.
A: According to the requirements of the bidding documents.
4, the computer network system requires the configuration of all-fiber SAN architecture disk array storage, please name clearly to configure the specifications and the capacity of the hard disk, the controller is single control or redundant dual control?
A: See the picture for details.
5. What version of the operating software, database software, and postal and telecommunications service software required by the computer network system are required (basic, enterprise, etc.) and how many clients?
A: See the picture for details.
6. The sound reinforcement system should select the speaker according to the structural characteristics of the building, the functional use requirements and the national standard specifications. Because the bidding documents only have brief technical indicators of each equipment, and other indicators (such as maximum sound pressure level, sensitivity, Directivity) Considering whether design standards can be achieved is still a problem; the technical parameters of the parameters are simple and the speaker power is large. If the sensitivity is low, the maximum sound pressure level is also low, which does not meet the design requirements. Can you provide more detailed technical indicators?
A: See the picture for details.
7. In the list of bids, the list of items in Table 1-2 is inconsistent with the list of systems and equipment in Table 1-2-2. Is it based on the list of items in Table 1-2? Please specify.
Answer: Table 1-2 is divided into parts of the project quantity list.
8. In the bidding list, in the system and equipment price summary table, whether the material code can be replaced by the quota number, please be clear.
A: See the list for details.
9. Is the quantity and model of the equipment configuration and the detailed configuration list in the technical list in the bid list consistent with the list provided in the bidding documents? Or configure the list according to the drawings?
A: See the list for details. The quantity is subject to the list. The bidder should select the equipment according to the construction drawings and the characteristics of the project. The equipment configuration and technical parameters must meet the drawings and actual needs. Company Name: Zhejiang Huacheng Construction Engineering Tendering Agency Co., Ltd. Contact: Mr. Xu, Miss Jin Tel: 0571-87631327, 85719364 E-mail: Fax: Postal Code: Address:
FTTH Fiber Optic Splice Tray is designed to provide a place to store the fiber cables and splices and prevent them from becoming damaged or being misplaced. It is also called a splice enclosure or splice organizer. This device does not contain any technical functions, and the design is simple. Also, Fiber Optic Tray has a very low price for people to afford. However, the importance of fiber splice tray for protecting fibers is significant. And the skills needed for using a fiber splice tray is not as simple as you think.
Made by industrial high-quality ABS plastic, Fiber Optic Cable Tray is provided to place the fiber splice points and pre-terminated for fiber connectivity. The splice tray expands fiber splice capabilities as well as provides the splicing location for fiber optic cables. It can be put into the fiber distribution frame, fiber splice closure, optic terminal box, etc. Sijee offers different shapes of fiber splice tray with or without termination function. Fiber Optic Tray, Fusion Splice Box, Fiber Optic Cable Tray, Splice Tray Optic Fiber are available.
Applications:
Fiber splice trays are usually placed in the middle of a route where cables are required to be joined or at the termination and patch panel points at the end of the cable runs. Also, splices can be placed in a splice tray which is then placed inside a splice closure for OSP (outside plant) installations or a patch panel box for premises applications. As for indoor application, fiber splice trays are often integrated into patch panels to provide for connections to the fibers.
Fiber Optic Tray,Fusion Splice Box,Fiber Optic Cable Tray,Splice Tray Optic Fiber
Sijee Optical Communication Technology Co.,Ltd , https://www.sijee-optical.com